Naghashian, Mohammad Hossein (2015). Generalised cost benefit analysis for large infrastructure projects: the case of the channel tunnel rail link. University of Birmingham. Ph.D.
|
Naghashian15PhD.pdf
PDF - Accepted Version Download (3MB) |
Abstract
Even in the absence of specific evidence it is surely unthinkable to imagine Napolean Bonaparte himself, when considering the potential benefits of invading England, failing to weigh against them the costs of building a tunnel under \(La\) \(Manche\). In the light of the considerable literature of cost benefit analysis (CBA) and by gathering together several analyses that have been performed on the Channel Tunnel in more recent times, this thesis demonstrates that a comprehensive ‘big picture’ CBA framework is missing, and then provides one: a new methodology, represented in Data Flow Diagram (DFD) form, for the generalised cost benefit analysis of large infrastructure projects.
Type of Work: | Thesis (Doctorates > Ph.D.) | |||||||||
---|---|---|---|---|---|---|---|---|---|---|
Award Type: | Doctorates > Ph.D. | |||||||||
Supervisor(s): |
|
|||||||||
Licence: | ||||||||||
College/Faculty: | Colleges (2008 onwards) > College of Engineering & Physical Sciences | |||||||||
School or Department: | School of Engineering, Department of Mechanical Engineering | |||||||||
Funders: | None/not applicable | |||||||||
Subjects: | H Social Sciences > HF Commerce T Technology > TF Railroad engineering and operation T Technology > TJ Mechanical engineering and machinery |
|||||||||
URI: | http://etheses.bham.ac.uk/id/eprint/5633 |
Actions
Request a Correction | |
View Item |
Downloads
Downloads per month over past year